 | |  |  |  | |  | Newcastle Central train station celebrated its 150th birthday with a refurbishment which used Colorcoat HPS200® for the roof. The history of the Grade I listed building, built between 1845 and 1850, meant that any regeneration had to be done sympathetically and artistically.
|
|
 |  | Loseley Dairy Ice Cream is the UK’s largest premium ice-cream manufacturer and has developed one of Europe’s most advanced facilities, based in South Wales. Originally constructed to house an electronics assembly line, the building needed significant refurbishment to make it suitable for food processing. This included re-cladding the interior walls and lifting the ceiling on the cold store to increase the height of the building and accommodate production equipment.
|
|
 |  | Noon Products Ltd completed the construction of a new facility at Southall in February 2003, which incorporated Corus Assure® pre-finished steel with Microban® anti-bacterial protection.
|
|
 |  |
|  |
|  | |  |