Industrial case studies

Industrial case studies

Over the past forty years pre-finished steel has become the most popular choice for both roofs and walls in industrial buildings enabling speedy and precise construction. The latest generation of Colorcoat® products help to continue this trend, incorporating advanced coatings into established cost effective cladding solutions.

Astral Court - Balgan Bay
Astral Court - Balgan BayBaglan Bay Energy Park in Port Talbot, is the UK’s largest single investment site, boasting over 650 acres of prime manufacturing land. One of the most prominent buildings on the site is Astral Court, a 4645 m2 industrial unit comprising a production unit and ancillary office accommodation.
Georgina von Etzdorf textile workshop - Wiltshire
Georgina von Etzdorf textile workshop - WiltshireSimon Conder Associates' workshop for textile firm Georgina von Etzdorf, is sited amongst a coppice of young ash trees. The building is seen to belong to its site in Wiltshire and is as comfortable in its rural surroundings as any mediaeval tithe barn.
Loseley Dairy Ice Cream Factory - Cwmbran
Loseley Dairy Ice Cream Factory - CwmbranLoseley Dairy Ice Cream is the UK’s largest premium ice-cream manufacturer and has developed one of Europe’s most advanced facilities, based in South Wales. Originally constructed to house an electronics assembly line, the building needed significant refurbishment to make it suitable for food processing. This included re-cladding the interior walls and lifting the ceiling on the cold store to increase the height of the building and accommodate production equipment.
Lyons Seafood, Wiltshire
Lyons Seafood, WiltshireWhen Lyons Seafoods needed to expand its chilled food production base in Warminster it had two options: buy up an adjacent builder’s yard and extend or move to a completely new site away from the area.
Noon Products Ltd - Southall
Noon Products Ltd - SouthallNoon Products Ltd completed the construction of a new facility at Southall in February 2003, which incorporated Corus Assure® pre-finished steel with Microban® anti-bacterial protection.
St. Kilda Powerhouse
St. Kilda PowerhouseThree years ago, the original Powerhouse on the remote Scottish island of St. Kilda was nearing the end of its life. In order to ensure the integrety of the installationinto the future, it was decided to refurbish the building, rather than demolish and replace it.
The Eco-Factory Gateway development, Glamorgan
The Eco-Factory Gateway development, GlamorganFrom the early 1970s techniques have been developed to improve the energy efficiency of factory buildings in the UK. These developments in theoretical studies and eventually in built form have mainly focused on improvements in the thermal efficiency of the building envelope.
The Wallis building, Birmingham
The Wallis building, BirminghamA challenge faced the architects in the design and regeneration of an industrial building on the Junction Six Industrial and Business Park in Witton, Birmingham. The brief comprised the refurbishment of the former headquarters of the GEC organisation, a building originally designed by Wallis Gilbert & Partners.