ProLogis Pineham

Pineham, Northampton

The construction of a new distribution depot for Sainsbury’s in Northampton is setting new benchmarks in sustainable design, with help from Confidex Sustain®

Project Summary images - pinehamFS.jpgProject Summary images - pinehamFS2.jpgProject Summary images - pineham_quote.gif

Based in Pineham, Northampton, the new 618,500 sq ft distribution centre is being developed by ProLogis using a number of advanced features designed to markedly reduce energy consumption and carbon emissions at the site. Indeed, architects, RPS Group,based in Newark, estimates that carbon emissions will be reduced by at least 50%, with the overall operation being up to 75% more energy-efficient than a standard warehouse facility.

As Roger Burnley, Sainsbury's Head of Supply Chain, explains: "We recognise that virtually every business decision we make has an impact on the environment, and that we can minimise that impact by improving our stores and business facilities, reducing packaging, promoting recycling and improving transport. We're extremely pleased that so many sustainable design features will be incorporated into our new distribution facility at Pineham."

By specifying a pre-finished steel building envelope at the outset, the sustainability credentials of the project are already exceptionally high.

A variety of advanced environmental features and technologies will significantly reduce energy consumption and carbon emissions at Pineham, improving the overall energy efficiency of the development. Thanks to the co-operation of the supply chain - using Confidex Sustain® - the majority of the building envelope has a Carbon Neutral status, explains Richard Smyth, Associate at RPS, Newark. Without doubt, it is the use of Confidex Sustain® that sets this project head and shoulders above other retail distribution developments.

    

Colorcoat Connection® Helpline

+44 (0) 1244 89 24 34 (UK)
Or click here to contact us 

Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra® pre-finished steel provides exceptional performance and corrosion resistance for building envelope applications. Guaranteed for up to 40 years it is backed up even more extreme testing and real world global data to demonstrate it’s super durable characteristics.

Go there

Fact file

Architect

RPS Burks Green

Contractor

Buckingham Construction

Cladding contractor

CA Roofing Services

System manufacturer

CA Group

System type

Built-up

Profile reference

Twin-Therm™

Colorcoat® product

Colorcoat HPS200®

Colour

Goosewing Grey, Merlin Grey