Site Preparation

Having specified the most appropriate pre-finished steel cladding system, it is important to ensure that the integrity of the cladding is maintained once it has been delivered to site. This will help ensure the best long-term performance in use.

Here guidance is provided on the storage and handling of cladding sheets including those delivered with a protective strippable film. There is also a reminder about the requirement to check steelwork tolerances and alignment before installation of the cladding begins. A checklist is provided for easy reference on site. 

Alignment and tolerance of steelwork

Protective strippable film

Storage and handling


Before commencing cladding work, the alignment and tolerance of the steel work structure of the building should be checked to ensure it is within the specification as given in the National Structural Steelwork Specification Guide. If it is not, panels may not fit correctly.

Back to Top

Although individual profilers' practice will vary, many wall cladding products are supplied with strippable film to protect them during storage and handling. Films vary in their thickness, adhesive type and opacity. The profiler will be able to advise on the optimum film for particular paint types and applications.

Upon delivery to site, protective films must not be exposed to sunlight for long periods. Polythene films and their adhesives may be susceptible to ultraviolet (UV) degradation, making it difficult to remove the film or leaving a residue which could attract dirt to the surface of the coating. 

Back to Top

If sheets are handled and stored with care, then in use they can have a life of many years. However, failure to observe simple but essential precautions on site can be costly. It can lead to damage, delay and expense, and may ultimately affect the long-term performance of a cladding system. So, a number of steps should be taken to avoid such a situation:

  • The site supervisor should immediately inform the supplier of any missing or damaged sheets.
  • Sheets in bulk should be handled using a lifting beam in conjunction with suitable slings and spreaders, or a fork-lift truck with appropriate fork dimensions. Long sheets should be lifted using a suitable long lifting beam.
  • If storage indoors is not possible, protect the sheets – particularly opened packs – with a tarpaulin or waterproof covering, which should be supported on a scaffolding frame, leaving sufficient room on all sides for air to circulate. Store the sheets off the ground on timber bearers which should be spaced no more than 900 mm apart. Incline the stacks so that any rain which penetrates the covering will drain off. If stacked or bundled products do become wet, then separate them and wipe them dry with a clean cloth.
  • Inspect the sheets at regular intervals to check for any leaks in the covering.
  • Sheets should be handled carefully to avoid damage. Do not drag materials over rough surfaces or fixed sheets. Do not drag tools over sheets, and protect from swarf (metal debris).
  • When carrying by hand, use appropriate Personal Protective Equipment (PPE) and carefully lift and turn sheets and carry them on their edge.
  • Wherever possible, lift single sheets manually onto the roof. If a sheet has to be hoisted into position, make sure that its edges are protected and that pressure across the sheet does not distort it. Use only ropes or slings for hoisting, never chains.
  • When working on a roof, wear only soft-soled shoes. 

Back to Top

 